On the eve of the power unit No. 2 of Zaporizhzhya NPP prematurely connected to the power system after the end of the scheduled mid-life repair. The repair time was 109.59 days. This "Chief" was informed in the information center of ZNPP.
10 May 2018, 16:46 ()