Each cubic meter of water equals approximately one ton. How much does the mass of the bowl, equipment, foundation and cover around the pool reach?. Vantagement accepts the prepared platform, the power of the land may be no less important than the depth of the formed model..
Silky soil, clay, sand and plots with a high level of groundwater are treated differently. Before starting the cob, you need to know if you need additional substitution of the base, drainage or protection of the bowl from the external pressure of water. It is especially important to assess the areas near structures, retaining walls and recently filled pits.
Get up to the foundation of the hut and other spores are identified in the depths of the pool. Earthling robots are not to blame for weakening the support of spores.
How much space will be lost after installing the sides and passages?.
The size of the pool in the catalog reflects the dimensions of the bowl, rather than the area of \u200b\u200bthe entire zone. In addition to this, you will need a place for installation, safe handling and maintenance.. If you plan to place sun loungers, showers, awnings or pavilions, their contours should also be drawn on the plan.
The passage from one side can be compact, but it is impossible to squeeze the bowl between the parka and the booth. Access is needed for cleaning, repairs and maintenance. The ridges should be deprived of more open space, so that people do not get stuck while entering and leaving the water.
You can manually mark the boundaries between the two zones, right in the middle of the yard.. Such a marking will show that it does not block the pool, roads to the garden, government buildings or parking lots. However, changing the bowl by one meter will significantly improve the layout of the entire plot.
How many drains flow into the volume of pool equipment.
Choosing a size for a flat yard is not enough. It is necessary to determine who and how the pool is located. For two adults who want to cool off in the sun, they can meet the needs of families with children and permanent guests.
The more people are near water at any one time, the more people need to use the filtration system. At the pool, skin particles, cosmetics, sawdust and other contaminants are wasted. The volume of water is always a problem: the productivity of the system, the adjustment of the nozzles and the correct water exchange are important..
Behind the scenes, take care of those who are swimming. Wide shanks are handy for fixing, but also for changing the corisna doujin. Increased depth is not suitable for everyone, and for extreme games near the water it may be a problem. The parameters of the bowl must correspond to the main scenario, and not to the rare, richly populated sustriches.
In such an hour the cup will be filled with water from the available water.
The volume of the pool is indicated in cubic meters, and the productivity of home water supply is estimated in liters per person or cubic meters per year. By dividing the bowl volume by the actual flow rate, you can approximate the hour required for refilling..
Rozrahunok should be taken into account with regard to the actual pressure on the shares. The characteristics of the pump indicated in the instructions may differ from the actual ones due to the depth of the drill hole, the diameter of the pipes and the current flow of water into the booth.. The shaft of the drilling robot at the borderline level will also require careful evaluation.
If the water is brought in from time to time, check the volume of one car, the number of trips and the possibility of getting to the pool. One hour varto z’yasuvati water warehouse. A high level of salt or salt folds the cob preparation and can be pressed onto the outer surface.
Chi grind away the visible tension for all possessions?
A filtration pump, clarification, heating system, anti-flow system, automatic dispensing station and other equipment are connected to the pool. For an important development, it is not the amount of effort indicated in the advertising description, but the possible overnight operation of devices.
When choosing a package, it is important to consider the capabilities of your home electrical system.. To add a swimming pool to your cottage with heating, filtration and heating, first check the tightness and the electrical wiring. One-hour operation of the boiler and air conditioner may cause overheating.
For control purposes, the lines are transferred, the automation is dry, the connections are grounded and safely placed. Retin the cable, the nominal parameters of the protection and the connection diagram are for qualified electricians.. A rubber pad placed in the nearest socket is not suitable for permanent use in a swimming pool..
How often filtration is responsible for passing the entire volume of water.
Select the pump and filter at the same time. The productivity of the system depends on the volume of the bowl and the required hour of repeated water exchange. Before the hour of unfurling, insure the pipe supports, stand up to the technical area, the number of turns and the height difference.
A too weak pump will not clean the water for a long time and may not ensure the normal operation of other devices.. The extreme pressure is also undesirable, since the filter does not cover such a flow. Water will pass through the filter material quickly, and energy consumption will increase without sediment crust.
The filtration schedule depends on the water temperature, frequency of bathing and drainage around the pool. On special days or after a large number of guests, the system is forced to work harder. Therefore, the expansion based on the minimal summer vikoristan leaves a very small supply.
How much heat does a swimming pool lose at night and in windy weather?.
Spending on heating is calculated not less than the effort of ownership. Most of the heat is lost from the surface at once from the water, which is evaporated. Wind speeds up this process, and cold nights increase the difference between water and wind temperatures.
When unwinding, check the surface area of \u200b\u200bthe water, the temperature, the season and the average weather conditions. Two pools of the same volume can accommodate a greater amount of energy, since one of them is wider and has a larger exposed surface.
This reduces daily consumption and reduces evaporation. It is advisable to include it in the project immediately and not to consider it as an unnecessary addition after the first high price for electricity.
Where do you supply water during filter washing and seasonal maintenance?.
The pool does not drain after a skin bath, but water is periodically spent on washing the filter, maintaining the equipment and adjusting the level. For these operations, the water supply is transferred to a separate place..
It is not possible to direct a large volume of water under the foundation, to the current plot or to the heights without assessing the storage. Water may have properties for decontamination and acidity regulation. The possibility of discharge from the sewerage system depending on its type, capacity and location.
As soon as the accumulation tank is installed, its capacity and fluidity are ensured. Also check that the pipes and drainage drain the flow of water without turning it up to the technical location.
As the volume of the pit is close to the surface and the volume of earthen work.
The foundation pit is wider than the bowl. Working clearance required for installation, connecting pipes and filling the space around the structure. Therefore, the volume of excavated soil should be insured based on the size of the pit, and not the pool itself.
After scooping, the primer fluffs up and takes up more space. A small hole on the plan can turn into a great embankment, for which a number of flights will be needed.. Part of the soil is divided according to the division, but the parent ball and the lower rocks are better to be folded.
The depth of the excavation, the type of soil, the presence of stones and the access of equipment are taken into account.. Manual work near utility lines or in a cramped yard is more difficult to work with.. Since the excavator cannot reach the return point, moving the soil to the desired location becomes a fixed task.
How much money will you need before the first bath, and not just before the bath?.
The new koshtoris begins with the bowl, but also includes many more positions. This includes delivery, excavation, excavation, foundation, pipes, filtration, electrical installation, water filling and commissioning work.. Carefully cover the pool area, lighten it, cover it and warm it up.
The skin position can best be divided into obovyazkova and additional ones.. Without filtration, the pool cannot be used normally, so decorative lighting or extensions for the sun loungers can be added later. This division protects the budget of basic operations from expenses for improvements.
It is necessary to transfer the reserve for the breakdown of furniture, which appears after the start of earthen work.. Unsuitable for communication, unstable soil or ground water change the project and extract additional materials. The final sum is responsible for ensuring that the pool is brought to the working mill, otherwise the increased price will lead to the fact that in the middle of the plot there will be no unexploited zone. Read about how important it is to open the pool before installing it on the site on the HiTech website. Expert.