Shuliavsky Bridge was disassembled in Kiev

08 August 2018, 18:14 | Kiev
photo Корреспондент.net
Text Size:

Part of the junction near the metro station Shulyavskaya in Kiev will be blocked for travel from August 18. Workers have already begun to dismantle the bridge, said the chief engineer of the KP Directorate for the construction of road and transport facilities Alexander Zdolnik, the channel Kiev.

He specified that they would limit movement on races near the overpass. But until the traffic on it will not stop, although the bridge itself has already been dismantled. According to him, the overlap will be introduced on August 18, and it will be valid for more than a year.

"We are blocking the congresses from Hetman Street to Victory Avenue and blocking the congresses from Victory Avenue to Alexander Dovzhenko Street in order to provide the possibility of re-engineering the engineering networks at this site," said Zdolnik.



Completely close traffic on the flyover in September.

Reconstruction of the transport hub will last almost a year and a half.

Recall, on June 1 it was reported that the beginning of the reconstruction of the Shulyavsky overpass in Kiev was postponed for an indefinite period because of a petition with an alternative version of the reconstruction, which the Kyiv City Council.

News from Telegram. Subscribe to our channel https: // t. me / korrespondentnet Author: 1.




Add a comment
:D :lol: :-) ;-) 8) :-| :-* :oops: :sad: :cry: :o :-? :-x :eek: :zzz :P :roll: :sigh:
 Enter the correct answer