The bridge to the occupied Crimea will follow the schedule with a slight lead.
This was announced by Russian President Vladimir Putin during the "direct line" with the Russians.
"All plans will be implemented on time and, most importantly, with proper quality.
The cost of construction is 200 billion rubles, "- said the head of Russia.
At the same time, he said that there is a problem with access roads to the bridge.
"Access roads are a separate topic, not only from Kerch, but also from the mainland. Without them, the bridge will look ridiculous, "Putin added..
As the "Observer" wrote, in the beginning of May new photos of the construction of the bridge across the Kerch Strait appeared in the network. Join the "Observer" group on Facebook, stay tuned!.