Reconstruction of checkpoints continues in the environmental protection zone

28 November 2018, 20:35 | The Company
photo glavnoe.ua
Text Size:

Since September, the reconstruction of Novotroitskoe KVVV has been going on.. Now all the forces are focused on the arrangement of waiting rooms and covering lanes.

This is reported by the press service of the Ministry of Internal Affairs:.

On the Vicarion of Scarlet, on the scaffolding of the comfort of the minds for the rest of the world, on the streets of the corridor, on the basis of the search and design, and on the basis of the design and development.

For tsі облаyu program vzhel obshtovano KPVV "Mar'inka". Such comforts umenovi peretin lіnії zіtknennya vzhe vigli positively otsіniti bulk. Veresnya trivaє reconstruction of KPVV "Novotroitske". The Nazis are all forced on the surrounding of the hall of the smoked ruku.

In addition, at the last minute the reconstruction and control and control point in the “Gnutove” road, at the same time, there are separate robots for the replacement of the main road and the main part of the complex..

Nezvazhayuchi on those scho reconstructions ZVAZNIKhI KVVV trivial, stinks function in a regular mode of the ruks in between the roads are not accelerated. Tom Derzhkordonsobstva zvertaєtsya z prokhannyam to all the great men, yakі planyuyt peretinati nayblichchim hour KPVV, but respected and listen to the rest of the day at a meeting.




Add a comment
:D :lol: :-) ;-) 8) :-| :-* :oops: :sad: :cry: :o :-? :-x :eek: :zzz :P :roll: :sigh:
 Enter the correct answer